TDD Power Plant Inspection

For sites already under investment, it is essential to verify that on-site construction complies with established standards. A site engineer representing the owner must be present to oversee the process.
Before shipping the modules, a thorough factory inspection must be conducted to ensure compliance with quality and performance standards.
For completed project sites, final acceptance testing must be conducted to verify compliance with standards and ensure operational readiness.
When facilitating transactions involving operating power plants, it is essential to confirm whether there are any defects during the operational phase or irregularities from the construction phase that could impact future energy generation.

EP,EQUATOR PRINCIPLES

Project financing consulting services
Project financing
Project related corporate loans
Bridge financing

Process

STEP 01 ►►►►►

Grading

A (High risk case)

B (Medium risk case)

 

C (Low risk case)

STEP 02 ►►►►

Medium risk case

Class C cases follow the general credit granting process

 

A/B level cases must provide an environmental and social risk assessment report (ESDD) issued by a third-party organization

STEP 03 ►►►

Review

STEP 04 ►►

Sign a contract

STEP 05 ►

Post Loa an Management


STEP 06

Annual audit